Work in progess of the plant C – Carbon components painting
With the arrival of summer, a new season has opened also for our PLANT C, the new plant entirely dedicated to the painting of carbon components.
After the ending of the planning phase and the acquisition of the necessary authorizations, the plant renovation works and – above all – the creation of the new operational infrastructures by our supplier FAM from Arezzo have achieved a good result. This Company is specialized in the design and creation of painting industry cabins and for bodywork.
The Plant C is located a few steps away from the historic plants in which the traditional activities such as classic cars restoration and bodywork will continue and a surface is about 1300 square meters and the storage area is about 1000 meters.
The complete layout is studied for ensuring simple and efficient production workflows, guaranteeing the high quality “by design” and the traceability of every single component thanks to the passive RFID system which will allow the Customer to get a real-time data access concerning the relevant information.
The new Plant which- as planned – should achieve its complete operational capability between the end of 2021 and the beginning of 2022 and it has required an investment of over 1,5 Millions Euros, it will ensure an increase of productivity by over 30% and it will lead to the hiring of fifteen new highly specialized people.
